๐ Entity ยท Product
HISTORICAL
6 mentions across 3 BUs โ 6 facts, 0 signals.
Where this product shows up
BU breakdown of mentions
- CMV Affiliate3 mentions
- Subscriptions2 mentions
- Cashiu1 mention
Mention timeline
Every fact and signal naming HISTORICAL, newest first
- CMV AffiliateCORRECTION โ iPrice deal is closed, not dormantiPrice was acquired and subsequently shut down. The acquisition is complete โ it is NOT an active Corp Dev project. The 14 open ClickUp tasks in the iPrice Deal project are stale cleanup items, not an active deal pipeline. **Stop surfacing iPrice as "80 days silent", "dormant deal", or "active" in briefings, signals, and Watch lists.** The Corp Dev section should not mention iPrice at all unless new activity actually materializes. This supersedes and clarifies the 2026-05-04 entry ("not actively maintained") โ the reality is stronger: the deal closed and iPrice was shut down. The prior entries are marked HISTORICAL below.
- CashiuCashiu transaction freeze (May 13โ14) (HISTORICAL โ see CORRECTION below)zero revenue/orders with engagement intact (50โ59 installs, 163โ176 DAU) โ points to payment gateway or offer-configuration failure, not an app outage.
- SubscriptionsISP publisher zero-conversion diagnosis (HISTORICAL โ see CORRECTION below)Two named publisher failures โ Sam Yap's ISP ("iAds Social Project", 3.5k clicks/day, zero conv on Shein/Trip/Klook/Oppo ID) and Raja Nazaruddin's iAds Vivo (traffic dead late April). Both are PG-managed publishers. Validation pipeline itself is healthy.
- SubscriptionsiAds zero-conversion period is NOT validation backlog โ diagnosis revised (HISTORICAL โ see CORRECTION below)**CORRECTION 2026-05-15: "iAds Social Project" has no connection to iAds publisher. See full correction entry below.** Investigation 2026-05-14 BQ deep-dive: the 14-day zero-conversion period across certain publishers (last validated conversion 2026-04-29) is **not** a validation-pipeline collapse. The BUP-1 framing as "validation backlog ยท realization rate 5.6%" was wrong. The actual story is two distinct operational issues across two publishers: **ISP publisher "iAds Social Project" (aff_id 1008463, Sam Yap-managed, Enterprise PG)** โ the dominant click source at ~3.5k/day from May 5 onward. Clicks fire on LIVE converting offers (Shein, Trip.com, Klook, Oppo ID) but produce ZERO conversions. **Smoking gun**: Shein-CPS โ ISP sent 4,465 clicks; other publishers run Shein at ~3.15% conversion rate; expected ~140 conversions, actual 0. That's not variance. Almost certainly traffic-quality (bot / incentivised / misattributed audience) OR a tracking/postback misconfiguration specific to this publisher's links. **Sam Yap should be asked to verify ISP's traffic source + check postback URLs.** **iads vivo (aff_id 1065674, Raja Nazaruddin-managed)** โ was healthy at 70-370 clicks/day with 1-7 conversions through April. **Late April collapse**: April 29 dropped to 3 clicks; May 1-12 just 1-3 clicks/day. This is a publisher traffic source dying, not a tracking issue. **Raja should check ivans vivo's upstream traffic source.** **Validation pipeline is fine**: in the same 14-day window, the other 88 Raja-managed publishers recorded 821k conversions on 87M clicks. Validation infrastructure is processing normally. iAds-specific zero is a real operational outcome, not a data lag. When the brief next addresses the iAds "validation collapse" item, anchor the diagnosis on these two specific operational issues, not on validation-pipeline framing. The 92.7% deep-critical backlog metric Andrew Tay's sheet shows must mean something different from what BUP-1 inferred โ likely an internal iAds-team metric about offer health or postback latency, not BQ aggregate latency.
- CMV AffiliateiPrice โ not actively maintained (HISTORICAL โ see CORRECTION 2026-06-01 below)iPrice is NOT being actively maintained anymore. This is a deliberate strategic posture, not an oversight. **Stop surfacing "iPrice Day N silent" or "iPrice integration stalled"** as flags โ that's the current state by design. iPrice content/affiliate maintenance has been deprioritised.
- CMV AffiliateiPrice integration (HISTORICAL โ see CORRECTION 2026-06-01 below)50 consecutive days of Basecamp silence as of 01 May 2026